PPR Pipe Fittings Wholesale

Plumbing PPR Pipe Fittings Manufacturers

ZHEJIANG QIAI TUBING INDUSTRY CO.,LTD was established in 1996, is professional China Plumbing PPR Pipes Manufacturers and Custom Plumbing PPR Fittings factory. QIAI Based on excellent management,relying on the perfect quality system .All the productions passed by ISO9001 international quality management systerm,Certificated by CE.Our main products include: PP-R pipes and fittings,Aluminum pipes and fittings, PE-RT pipes and fittings,Brass Fittings,Water and Gas Valves, Stainless Steel Corrugated Flexible Gas hose, wholesale Plumbing Pipe Fittings, and so on.At present, the company's product sales network has spread all over the world, establish and improve the quality, efficient and fast professional marketing management team and service support system for the vast number of users, welcome!

advantages

Easy Transportation

* Sea Freight The Starhouse cabin structure when flat packed for transportation is designed in accordance with a standard ISO shipping container. The corner casting structure enables lifting capability utilizing a crane in the same manner as a standard ISO shipping container. * On Site Transportation The dimensions of the forklift pockets on the cabin structure is 85mm* 260mm which enables forklift capability on site. * Road Freight Due to the structure being the same dimensions as a standard ISO shipping container road freight is efficient and easy to handle the cargo.

Fast Construction

Turnkey solution due to all components being flat packed, including the roof structure, floor, wall panels, doors, windows and interior decoration.
Up to 40% time saving on construction over convention building techniques due to all structural elements being prefabricated.
Construction of a single cabin can be undertaken with only four skilled workers.

Flexible Combination

The Starhouse cabins can be assembled and then disassembled for re transportation via road, train or sea.
Individual cabins can be linked together to form larger structures at ease through the starhouse Smart linking kit.
Internal wall panels can be removed and changed at the clients’ discretion to provide flexible layout options.

Cost Saving

Transportation costs are reduced by up to 75% cost compared with Traditional Architecture or modified containers.
Construction time is reduced by up to 40% saving time and money.
The ability to change internal layouts or relocate structures provides cost savings.

Green&Sustainable

Mineral wool which is used primarily for insulation in the structures can be recycled
The structure of the cabin is made from steel and once the client has no further use of the structure the steel can be recycled
Our manufacturing facilities are energy efficient with strict governance on wastage of materials and water supply.

Leave a Message

News Center

Quality Never Goes Out Of Service

What are the common applications of PPR Ball Valves in industrial settings?

1、PPR Ball Valves in Water Supply and Distribution Systems Water supply and distribution systems are fundamental to any infrastructure, whether in urban, industrial, or residential settings. These sys...

How Brass Pipe Fittings Enhance Safety in Gas Distribution Networks

The Role of Brass Fittings in Preventing Gas Leaks in Distribution Systems Gas leakage in distribution systems is one of the most critical issues that can compromise safety, damage property, and even ...

How do Plumbing Ball Valves contribute to energy efficiency in plumbing systems, particularly in heating or cooling applications?

Plumbing Ball Valves are engineered for precise flow regulation, a critical factor in ensuring energy efficiency, especially in heating and cooling systems. In these applications, managing the flow of...

How does the design of a Female Hose Valve ensure a secure and leak-free connection between the hose and the water source?

The threaded connection between the Female Hose Valve and the hose or faucet is fundamental to ensuring a secure and leak-free connection. This threading is precisely engineered to match standard hose...

How does the flow control mechanism of a Female Hose Valve affect water pressure and regulate the water flow in garden irrigation or other applications?

The flow control mechanism in a Female Hose Valve is designed to offer precise adjustment of water flow, enabling users to regulate the amount of water that passes through the hose. This is essential ...

How does the Temperature Auto Flow Control Valve help prevent thermal overload or overheating in hydraulic, pneumatic, or process fluid systems?

The Temperature Auto Flow Control Valve is designed to continuously monitor fluid temperature and automatically adjust the flow rate to maintain an optimal thermal balance within the system. In hydrau...

How do Plumbing PEX-Al-PEX Multilayer Pipes maintain performance and structural integrity in environments with extreme temperature variations?

Plumbing PEX-Al-PEX Multilayer Pipes are composed of three distinct layers: an inner layer of PEX (cross-linked polyethylene), an aluminum core, and an outer layer of PEX. This multi-layer constructio...

Features of Insulated Stainless Steel Corrugated Tubing

QIAI brand insulated stainless steel corrugated pipe is a composite pipe material. The stainless steel corrugated pipe is made of food-grade 304 stainless steel, with PE foam insulation on the outside...

Industry knowledge extension of this category

How to Install Plumbing PPR Pipe Fittings Effectively?
Before beginning any plumbing installation, the first step is proper preparation. This ensures the installation process is smooth, efficient, and free from mistakes. For installing PPR pipe fittings, you’ll need a selection of specialized tools and materials. Start by gathering PPR pipes and PPR fittings from a reputable supplier like Zhejiang Qiai Tubing Industry Co., Ltd, ensuring that the sizes of pipes and fittings match. A pipe cutter is needed for clean and precise cuts. Accurate measurements are essential, so always have a measuring tape on hand. After cutting, the pipes will have sharp edges that need to be smoothened, which can be done using a deburring tool. You will also need a pipe welding machine, which is critical for fusing the pipes and fittings together by applying heat. The heat source such as a welding machine or heat gun is essential for pre-heating the pipes and fittings to the correct temperature. Zhejiang Qiai Tubing Industry Co., Ltd ensures that its PPR fittings and pipes are compatible with most standard welding equipment, making the installation process easier. Finally, a cleaning cloth or cleaning solution should be used to ensure that the pipe and fitting surfaces are free from contaminants before welding. Proper preparation reduces the risk of installation errors and ensures that your PPR fittings perform as expected.

Measuring and cutting the pipes to the correct length is a critical step in the installation of PPR pipe fittings. Accurate measurements ensure that the pipes fit perfectly within the plumbing configuration, preventing unnecessary modifications later on. To begin, carefully measure the length of the pipe needed for your installation using a measuring tape. It's crucial to double-check measurements to avoid mistakes. After marking the cutting line on the pipe, use a pipe cutter to make a clean, straight cut. A pipe cutter is designed to create clean, even cuts, which are necessary for a proper fusion when joining the pipes to the fittings. It’s important to use a sharp pipe cutter to avoid damaging the pipe during the cutting process. After cutting, the pipe will have rough edges that can interfere with the fusion process, potentially creating weak points. Use a deburring tool to smooth the edges and remove any sharp particles that could affect the welding process. Properly preparing the edges ensures a secure and tight connection when the pipe is fused with the fitting. When cutting longer pipes, make sure the cuts are straight and the pipe is cut at a 90-degree angle to ensure that the joint will be perfectly aligned. Poorly cut pipes can lead to weak joints, which are prone to leaks or failures over time.

Cleaning both the pipe and the fitting surfaces is a vital step before proceeding with the welding process. Any dust, grease, or other contaminants left on the pipe or fitting can affect the bonding process and lead to weak connections. Zhejiang Qiai Tubing Industry Co., Ltd recommends using a clean, lint-free cloth or a specialized cleaning solution for PPR pipes and fittings to remove any debris. The cleaning process ensures that the surfaces are free from dirt, oil, and moisture, all of which can interfere with the welding process and lead to a poor bond between the pipe and the fitting. Simply wiping the pipe and fitting down with a cloth may not be enough, especially if the surfaces are heavily contaminated. In these cases, use a suitable cleaning solution to thoroughly clean the surfaces. It is essential to avoid using harsh chemicals or solvents that could damage the PPR material. After cleaning, make sure the pipe and fitting are completely dry before proceeding. If moisture is present, it can cause the fusion process to fail or weaken the joint. Thorough cleaning ensures that the welding process forms a strong, secure bond, which is necessary for the longevity and performance of the plumbing system.

Pre-heating the pipe ends and fittings is a crucial step for achieving a strong, leak-proof joint. PPR fittings are fused using heat, which softens the materials and allows them to bond together. The correct heating process is vital, as overheating or underheating can cause the joint to fail. Zhejiang Qiai Tubing Industry Co., Ltd’s PPR pipes and fittings are designed to work with standard PPR pipe welding machines, which provide the necessary heat for the fusion process. When preparing to weld, set up the PPR pipe welding machine and adjust the temperature to the recommended range, typically 260°C to 280°C. It’s important to monitor the temperature carefully during the heating process. If the pipe or fitting is not heated sufficiently, the fusion will not form a strong bond. Conversely, if the pipe or fitting is overheated, the material can warp or deform, compromising the integrity of the joint. Place both the pipe end and the fitting into the welding machine's heating elements and allow them to heat for the recommended duration. During this time, ensure that both parts are evenly heated. If the materials are not heated evenly, the joint will be weak, which can lead to leaks and premature failure. Zhejiang Qiai Tubing Industry Co., Ltd ensures its products are compatible with most standard welding equipment, which helps make the installation process simpler and more reliable.

Once the pipe and fitting have reached the correct temperature, the next step is to join them. It’s essential to act quickly but carefully during this phase to ensure a successful connection. Remove the pipe and fitting from the welding machine, ensuring they are not overheated. As soon as you remove the parts from the heating elements, the clock starts ticking, so align the pipe and fitting immediately. Misalignment during this step can result in weak joints, which are more susceptible to leaks and failure. Insert the heated pipe into the fitting, making sure that the pipe slides smoothly into the fitting without any resistance. It is crucial that the pipe and fitting are aligned correctly before insertion. Once inserted, hold the parts together for several seconds to ensure that the fusion bond forms properly. You should not apply excessive force but rather just enough pressure to ensure the pipe and fitting make full contact. During this time, ensure that the pipe does not slip out of the fitting. If misalignment occurs at this stage, it may compromise the joint and lead to leaks. The fusion process should create a small bead around the joint, which is a clear indication that the bond has formed correctly.

After fusing the pipe and fitting, it is essential to allow the joint to cool down naturally. Cooling too quickly or applying pressure to the joint while it is still hot can cause the bond to weaken or deform. Let the joint cool for several minutes in a dry, clean environment. Zhejiang Qiai Tubing Industry Co., Ltd ensures that its fittings and pipes are designed for efficient cooling, which helps preserve the integrity of the fusion joint. Once the joint has cooled, inspect it carefully to ensure there are no visible defects. The fusion should form a uniform bead around the joint, indicating that the connection is strong and secure. Check for any air pockets, cracks, or gaps around the connection. If any imperfections are found, the joint will need to be re-welded or replaced. Proper inspection ensures that your plumbing system will perform reliably without leaks or failures.